- Servicing North Toronto & GTA
Adding a brand new bathroom to your unfinished basement is one of the best ways to increase your home's value. We handle everything – concrete cutting, rough-in plumbing, ejector pumps, permits, and finishing. 3–6 week timeline with all licensed trades included.
✓ Free consultation · Itemized quote with no surprises · All permits handled
Configure your new basement bathroom below to get an instant estimate. Select your layout, specify if you need an ejector pump, choose your finish tier, and add any extras. Prices update instantly below.
Select the bathroom configuration you need
Required if your basement is below the sewer line
Choose your materials and fixtures quality
Select any additional features. Prices update instantly below.
Based on your selections below
Or call (647) 725-9754
Final pricing depends on your basement's concrete depth, existing plumbing access, square footage, and fixture selections. All estimates above are for new installation in an unfinished basement. We provide a detailed itemized quote after a free on-site consultation – no surprises.
This isn't a standard renovation – it's a new installation built from scratch in an unfinished space. Below-grade construction involves challenges you won't find in any other bathroom project. Here's what we handle – so you don't have to.
Basement bathrooms are built from scratch – new stud walls for the room layout, concrete cutting for drain and supply lines, and bulkheads to conceal joists, ductwork, and pipes above. We handle all structural work so your bathroom looks finished, not like an afterthought.
Basements sit below the municipal sewer line. An ejector pump moves waste water up and out. We size, install, and test the system to code – this is the step most homeowners don't know about until it's too late.
Below-grade spaces are prone to moisture. We install proper waterproofing membranes, ventilation, and exhaust systems to protect your investment and keep your new bathroom dry.
Basement bathroom installations require plumbing, electrical, and building permits in Richmond Hill and York Region. We handle all permit applications, inspector scheduling, and final sign-offs.
From basic 3-piece installs to luxury finishes – here's what's possible in your unfinished basement.
It depends on your home's plumbing layout. If your basement sits below the municipal sewer line – which is the case for most homes in York Region – then yes, an ejector pump is required. During your free consultation, we'll check your existing sewer connection and let you know exactly what's needed before you commit to anything.
Most basement bathrooms take 3–6 weeks from demolition to final inspection. The concrete cutting and rough-in phase takes the longest. After that, framing, waterproofing, tile, and finishing move quickly. We build a realistic timeline into every quote so you know exactly when to expect it done.
In most cases, yes. The main factors are your basement's ceiling height (minimum 7 feet for code compliance), access to plumbing connections, and whether an ejector pump is feasible in your space. We've installed basement bathrooms in homes across Richmond Hill, Vaughan, Aurora, and the wider York Region – and we'll tell you upfront if there are any issues.
Your new basement bathroom is just 3–6 weeks away. Get a free consultation and detailed, itemized quote with no surprises. We handle concrete cutting, plumbing, permits, and professional installation from start to finish.
Get a detailed, itemized quote with transparent pricing. We'll visit your basement, assess your plumbing needs, and provide a comprehensive proposal—all at no cost.
Get Basement Bathroom QuotePrefer to talk right away? Call us to discuss your basement bathroom project, ask questions about ejector pumps, or schedule your free in-home consultation today.
(647) 725-9754